[1] 曹先伟, 王常宇, 夏春晶. 基于数值模拟计算的A型动车组围护结构传热系数优化计算[J]. 城市轨道交通研究, 2017, 20(12): 29-32. CAO X W, WANG C Y, XIA C J. K-value optimization calculation of type A high-speed train based on numerical simulation[J]. Urban Mass Transit, 2017, 20(12): 29-32 (in Chinese). [2] 王兴龙, 王海英, 王 刚, 等. 动车组车体传热系数计算方法对比分析[J]. 青岛理工大学学报, 2015, 36(1): 102-107. WANG X L, WANG H Y, WANG G, et al. Comparison of calculation methods about heat transfer coefficient of Electric Multiple Unit[J]. Journal of Qingdao Technological University, 2015, 36(1): 102-107 (in Chinese). [3] 曹长业, 穆小丽, 杨 弘. 高寒动车组隔热结构研究[J]. 铁道机车与动车, 2016(11): 24-26+3. CAO C Y, MU X L, YANG H. Study on thermal insulation structure of cold EMU[J]. Railway Locomotive and Motor Car, 2016(11): 24-26+3 (in Chinese). [4] 欧阳仲志. 动车组和轨道客车节能研究[J]. 铁道车辆, 2015, 53(8): 17-21+9. OUYANG Z Z. Study on energy saving of EMU and rail passenger cars[J]. Rolling Stock, 2015, 53(8): 17-21+9 (in Chinese). [5] 中华人民共和国铁道部. 铁路空调客车热工计算方法: TB/T 1957—1991[S]. 北京: 中国铁道出版社, 1992. Ministry of Railways of the People's Republic of China. Conditioned railway passenger thermal calculation method: TB/T 1957—1991[S]. Beijing: China Railway Publishing House, 1992 (in Chinese). [6] The British Standard Institution. Railway applications-air conditioning for main line rolling stock-comfort parameters and type tests: BS EN 13129:2016[S]. UK: BSI Standards Limited, 2016. [7] 李文彪, 陈建芳, 刘 欣. 高速动车组塞拉门隔热性能提升[J]. 铁道车辆, 2023, 61(2): 64-67+97. LI W B, CHEN J F, LIU X. Improvement of the thermal insulation performance of the plug door of high-speed EMUs[J]. Rolling Stock, 2023, 61(2): 64-67+97 (in Chinese). [8] 中华人民共和国铁道部. 铁道客车单元式组合车窗: TB/T 3107—2011[S]. 北京: 中国铁道出版社, 2011. Ministry of Railways of the People's Republic of China. Unit combined windows for railway passenger car: TB/T 3107—2011[S]. Beijing: China Railway Publishing House, 2011 (in Chinese). [9] 万成龙, 单 波, 胡乃冬, 等. 基于表面平均温度的建筑门窗保温性能测试方法研究[J]. 新型建筑材料, 2019, 46(9): 105-108. WAN C L, SHAN B, HU N D, et al. Application of surface average temperature in thermal insulation performance testing of building doors and windows[J]. New Building Materials, 2019, 46(9): 105-108 (in Chinese). [10] The British Standard Institution. Glass in building-determination of thermal transmittance (U value)-calculation method: BS EN 673: 2011[S]. UK: BSI Standards Limited, 2011. [11] 国家市场监督管理总局, 国家标准化管理委员会. 汽车安全玻璃试验方法 第4部分:太阳能特性试验: GB/T 5137.4—2020[S]. 北京: 中国标准出版社, 2020. State Administration of Market Supervision and Administration, National Standardization Management Committee. Test methods of safety glazing materials used on road vehicles-part 4: determination of solar characteristic: GB/T 5137.4—2020[S]. Beijing: China Standard Press, 2020 (in Chinese). |