[1] 王学娟,刘全军,王奉刚.金矿尾矿资源化的现状和进展[J].矿冶,2007,16(2):64-67. WANG X J, LIU Q J, WANG F G. Present status and progress on the gold tailings’s resource[J]. Mining and Metallurgy, 2007, 16(2): 64-67 (in Chinese). [2] 陈芳芳,张亦飞,薛 光.黄金冶炼污染治理与废物资源化利用[J].黄金科学技术,2011,19(2):67-73. CHEN F F, ZHANG Y F, XUE G. Disposal to pollution and resource utilization to waste for gold smelting[J]. Gold Science and Technology, 2011, 19(2): 67-73 (in Chinese). [3] 王 旭.黄金冶炼污染治理与废物资源化利用[J].冶金与材料,2019,39(3):187+189. WANG X. Disposal to pollution and resource utilization to waste for gold smelting[J]. Metallurgy and Materials, 2019, 39(3): 187+189 (in Chinese). [4] 姚志通,李金惠,刘丽丽,等.黄金尾矿的处理及综合利用[J].中国矿业,2011,20(12):60-63+66. YAO Z T, LI J H, LIU L L, et al. The treatment and comprehensive utilization of gold tailings[J]. China Mining Magazine, 2011, 20(12): 60-63+66 (in Chinese). [5] 袁 玲,孟 扬,左玉明.黄金矿山尾矿资源回收和综合利用[J].黄金,2010,31(2):52-56. YUAN L, MENG Y, ZUO Y M. Recovery and comprehensive utilization of gold tailings[J]. Gold, 2010, 31(2): 52-56 (in Chinese). [6] 孙旭东,刘晓敏,龚 裕,等.黄金尾矿建材化利用的研究现状及展望[J].金属矿山,2020(3):12-22. SUN X D, LIU X M, GONG Y, et al. Research status and prospects for the utilization of gold tailings as building materials[J]. Metal Mine, 2020(3): 12-22 (in Chinese). [7] 梁国海,齐志超,吴 健,等.黄金尾矿用于生产烧结墙体砖试验研究[J].有色金属(矿山部分),2018,70(6):16-19. LIANG G H, QI Z C, WU J, et al. Experimental study on producing sintered wall bricks with gold tailings[J]. Nonferrous Metals (Mining Section), 2018, 70(6): 16-19 (in Chinese). [8] PARTHASARATHI N, RAMALINGA REDDY B M, SATYANARAYANAN K S. Effect on workability of concrete due to partial replacement of natural sand with gold mine tailings[J]. Indian Journal of Science and Technology, 2016, 9(35): 1-4. [9] 丁亚斌,吴卫平.利用黄金尾矿生产加气混凝土砌块[J].新型建筑材料,2009,36(12):38-40. DING Y B, WU W P. Preparation of aerated concrete block by making use of the gold tailings[J]. New Building Materials, 2009, 36(12): 38-40 (in Chinese). [10] SHAO H, LIANG K, PENG F, et al. Production and properties of cordierite-based glass-ceramics from gold tailings[J]. Minerals Engineering, 2005, 18(6): 635-637. [11] 段美学,闫传霖,赵蔚琳.金尾矿焙烧陶粒的制备[J].砖瓦,2014(7):52-55. DUAN M X, YAN C L, ZHAO W L. Preparation of gold tailings ceramsite[J]. Block-Brick-Tile, 2014(7): 52-55 (in Chinese). [12] 周明凯,王亚婕,王怀德.金尾矿高硫选冶尾渣制备发泡陶瓷[J].中国陶瓷,2016,52(3):77-81. ZHOU M K, WANG Y J, WANG H D. Study of foam ceramic prepared by high-sulfur gold ore tailings[J]. China Ceramics, 2016, 52(3): 77-81 (in Chinese). [13] CABALLERO E, SÁNCHEZ W, RÍOS C A. Synthesis of geopolymers from alkaline activation of gold mining wastes[J]. Ingeniería Y Competitividad, 2014, 16(1): 317-330. |